Business and Finance Business and Finance
Tue, August 10, 2010

Sunward intersects 263.1 metres of 0.86 g/t gold and 0.33% copper at the Titiribi project


Published on 2010-08-10 06:20:25 - Market Wire
  Print publication without navigation


 ------------------------------------------------------------------------- Orien- tation Au Drill (incli- Total (g/t) Cu % hole nation/ Depth From To Length Lithology wt. wt. ID Azimuth) (m) (m) (m) (m) avg. avg. ------------------------------------------------------------------------- CV019 -58/N232 1047.35 0 756.5 756.5 Porphyry and 0.47 0.19 Intrusive Breccia ------------------------------------------------------------------------- Including 0 289.5 289.5 Porphyry and 0.34 0.12 Intrusive Breccia ------------------------------------------------------------------------- also 412.0 675.1 263.1 Porphyry and 0.86 0.33 Including Intrusive Breccia ------------------------------------------------------------------------- also 570.5 675.1 104.6 Porphyry and 1.17 0.38 Including Intrusive Breccia ------------------------------------------------------------------------- 
Contributing Sources