Sun, May 4, 2025
Sat, May 3, 2025
Fri, May 2, 2025
Thu, May 1, 2025
Wed, April 30, 2025
Tue, April 29, 2025
Mon, April 28, 2025
Sun, April 27, 2025
Sat, April 26, 2025
Fri, April 25, 2025
Thu, April 24, 2025

Upgrade works to shut busy city road until 2026

  Copy link into your clipboard //business-finance.news-articles.net/content/202 .. ade-works-to-shut-busy-city-road-until-2026.html
  Print publication without navigation Published in Business and Finance on by BBC
          🞛 This publication is a summary or evaluation of another publication 🞛 This publication contains editorial commentary or bias from the source
  Lincoln Road in Peterborough will be shut southbound, with a one-way system between Windmill Street and Stone Lane.

The article from AOL News discusses a significant upgrade to the electrical infrastructure in a busy city center, which necessitated a temporary shutdown of power. This upgrade, undertaken by National Grid, involved replacing old cables with new ones to enhance the reliability and capacity of the electrical supply. The work was scheduled during a time intended to minimize disruption, but it still affected numerous businesses and residents. National Grid apologized for the inconvenience and emphasized the long-term benefits of the upgrade, which include improved power stability and reduced risk of outages. The project is part of a broader initiative to modernize the city's aging electrical grid.

Read the Full BBC Article at:
[ https://www.aol.com/news/upgrade-works-shut-busy-city-050731050.html ]