Thu, August 20, 2009
Wed, August 19, 2009
Tue, August 18, 2009
Mon, August 17, 2009
Sun, August 16, 2009
Fri, August 14, 2009
Thu, August 13, 2009
Wed, August 12, 2009
Tue, August 11, 2009
Mon, August 10, 2009
Sun, August 9, 2009
Sat, August 8, 2009
Fri, August 7, 2009
Thu, August 6, 2009
Wed, August 5, 2009
Tue, August 4, 2009

Cartier Resources Inc.: Cartier Reports High Grade Gold Results on Rambull: 27.72 g/t Au over 0.30 m


//business-finance.news-articles.net/content/200 .. results-on-rambull-27-72-g-t-au-over-0-30-m.html
Published in Business and Finance on Wednesday, August 12th 2009 at 5:57 GMT, Last Modified on 2009-08-12 05:57:57 by Market Wire   Print publication without navigation


VAL-D'OR, QUEBEC--(Marketwire - Aug. 12, 2009) - Cartier Resources Inc. (TSX VENTURE:ECR) ("Cartier") is pleased to announce new high grade gold results on its Rambull Project near Val-d'Or, Quebec. Channel sampling from recent trenching exposures at surface returned intersections ranging from 10.88 g/t Au over 1.00 meters and up to 27.72 g/t Au over 0.30 meters. Results received to date are from three out of the nine trenches (RAM-09-TR-01 to 09) excavated on two mineralized shears (refer to July 2, 2009 press release).

To date, numerous channel sample results show grades ranging from 0.10 g/t to 1.00 g/t Au over sub-metric to metric widths. Best results from individual trenches include:

- Trench RAM-09-TR-01: 1.27 g/t Au over 0.30 meters;

- Trench RAM-09-TR-02: several high grade gold intersections including 22.08 g/t Au over 0.40 meters, 9.32 g/t Au over 0.40 meters, 10.88 g/t Au over 1.00 meters and 2.61 g/t over 0.50 meters;

- Trench RAM-09-TR-03: 27.72 g/t Au over 0.30 meters and 2.18 g/t Au over 0.25 meters.

The samples cross quartz-chlorite-ankerite veins which are variably mineralized with pyrite. The veins are hosted within sheared and altered granodiorite.

The three trenches are spaced over a 100-meter strike length of the northern shear that parallels a granodiorite sill.

The remaining samples from the other trenches have all been shipped to the laboratory for assaying. All trenches and channel samples are being surveyed in detail by a contractor.

Cartier is planning a follow-up diamond drill program on the mineralized zones.

Quality Assurance/Quality Control

The Rambull exploration program is conducted under the supervision of Mr. Philippe Berthelot, P. Geo., qualified person as defined by National Instrument 43-101. Cartier has implemented and adheres to a strict Quality Assurance/Quality Control program which includes mineralized standards and blanks for each batch of samples. Assay samples are taken from drill core sawed in half with one half sent to a commercial laboratory and the other half retained for future reference. Analyses are either performed by Techni-lab S.G.B. Abitibi inc. in Sainte-Germaine, Quebec, or by ALS-Chemex in Val-d'Or, Quebec, both accredited laboratories.

The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this press release.



Publication Contributing Sources

Similar Business and Finance Publications